Este perfil está escrito en inglés
Senior Document Controller (Acting Team Leader)
Demonstrated experience with Document control & EDMS (SDMS).
Demonstrated experience with Inspection Requests & ITP logs.
Demonstrated experience with Submittals, shop drawings & RFIs.
Demonstrated experience with FAT reports & snag tracking.
Demonstrated experience with Quality records & ISO procedures.
Senior Document Controller (Acting Team Leader) open to new opportunities
Lead the document control team and run the inspection, submittal and correspondence workflows for the project.. Apply the Excel-based IR logs, Daily Inspection Plan and weekly pending / overdue reports developed at GAMA.
Prepared and issued the project quality reports and kept them revision-controlled and review-ready.. Coordinated Factory Acceptance Tests (FAT) with suppliers and manufacturers worldwide: schedules, approved test procedures, readiness, and attendance of the project team and client.. Prepared FAT reports and compiled complete FAT documentation packages in line with the Inspection & Test Plans.. Recorded every snag in a dedicated Snag Log, assigned responsibility, and followed each item with the supplier until it was corrected, verified and closed.. Arranged visas and travel documentation for the team and client representatives travelling to supplier factories in different countries, so FAT dates were never delayed.. Built Excel trackers for the FAT plan, reports and snag status, and followed up NCRs linked to FAT findings.. Worked as the link between Quality, Engineering, Procurement, Planning, suppliers and the client.
Led a team of 5, distributing tasks by experience and training new members; worked to company procedures aligned with ISO.. Created standard Models for Inspection and Concrete Pouring Requests following the Inspection Test Plan, avoiding missed or duplicated inspections.. Rebuilt the project logs in a horizontal, ISO-aligned format with rejection-reason tracking, box and file archiving columns, a dynamic audit that flags wrong data (action, date, missing scan, duplicates), smart hyperlinks to scanned documents, and weekly, bi-weekly or monthly reports with charts.. Built a "Catcher" system showing requests ready for submission, missed, submitted and stamped as received.. Created systems and logs for scaffolding-dismantling release (RSD), elevation activity tracking, internal NCRs and SWIs, rejected IRs, Weekly Pouring Plan, quarry records, minutes of meeting, project memos, sub-contractor files and new-activity start.. Produced the Daily Inspection Plan, weekly pending / overdue lists and weekly progress-meeting minutes for the Project Manager, department managers and consultant.. Built support tools for other departments: HR Services portal, equipment and transportation time sheets, Planning work-plan log with date-driven colors, and a warehouse stock log with minimum-quantity alerts.. Coded shop-drawing and document footers (n of n) to prevent mixing during scanning and distribution; took weekly backups of all DC data.
Led a team of 6 and ran the full document control cycle: letters, Inspection Requests and DIP, document / material / shop-drawing submittals, RFIs, transmittals and internal memos.. Handled daily (technical and manpower), weekly and monthly reports, minutes of meeting (translation, writing, log and distribution), and NCNs.. Managed sub-contractor invoices, Purchase Requests and LPOs, sub-contracts and addendums, NOC and Employer's Instructions, field change requests and As-Built documentation.
Managed Inspection Requests and the Daily Inspection Plan; prepared direct, daily, weekly, bi-weekly and monthly reports.. Maintained the steel structure logs and drawings, and designed new logs with formatting and formulas.
Logged and filed Inspection Request actions; serialized and filed hard and soft copies of all documents.. Scanned, renamed and combined documents and drawings; operated photocopiers and plotter; delivered and received documents with the competent authorities.